Release without ignition from a refinery pipeline

Event

Event ID
893
Quality
Description
During a patrol, an operator detects a hydrogen leak in a refinery on a footbridge 30 meters high. The origin of the leak is identified 4 days later on a pipe under insulation. The operator proceeds to remove the insulation (under SCBA). The leak is located at the level of a reinforcing saddle.

The installation is shut down and put under nitrogen. Thickness measurements and radiographic checks are used to characterise the nature of the crack defect. A leak sealing system (SOFM) is put in place while awaiting the removal of the pipework for assessment during the next shutdown.
Event Initiating system
Classification of the physical effects
Unignited Hydrogen Release
Nature of the consequences
Leak No Ignition (No additional details provided)
Macro-region
Europe
Country
France
Date
Root causes
Root CAUSE analysis
The INITIATING cause of the leak was a crack defect on the reinforcing saddle of a hydrogen pipe.
No detailed is known on the failure mechanism.

Facility

Application
Petrochemical Industry
Sub-application
Generic refinery process
Hydrogen supply chain stage
All components affected
hydrogen pipeline
Location type
Open
Location description
Industrial Area
Operational condition

Emergency & Consequences

Number of injured persons
0
Number of fatalities
0

Event Nature

Release type
gas
Involved substances (% vol)
H2 100%
Presumed ignition source
No ignition

References

Reference & weblink

ARIA event no. 55163