- An operator noted a loose tube sheet flange stud on a high temperature, high pressure heat exchanger in an hydrodealkylation unit.
The stud was found to be cracked through. Analysis proved to be made of standard steel instead of the alloy type specified. Some of the other studs had started to crack.
The studs had been replaced on the previous shutdown when the heat exchanger was opened up to clean the tube bundle. - Event Initiating system
- Classification of the physical effects
- No Hydrogen Release
- Nature of the consequences
- Macro-region
- Europe
- Country
- United Kingdom
- Date
- Main component involved?
- Heat Exchanger
- How was it involved?
- Rupture
- Initiating cause
- Wrong Material Choice
- Root causes
- Root CAUSE analysis
- Incorrect component material
Facility
- Application
- Petrochemical Industry
- Sub-application
- Hydrodealkylation unit
- Hydrogen supply chain stage
- All components affected
- shell and tube heat exchanger
- Location type
- Unknown
- Location description
- Industrial Area
- Operational condition
- Pre-event occurrences
- The failed studs had been replaced on the previous shutdown when the heat exchanger was opened up to clean the tube bundle.
- Description of the facility/unit/process/substances
- DESCRIPTION OF THE CHEMICAL PROCESS
Hydrodealkylation is a chemical reaction that often involves reacting an aromatic hydrocarbon, such as toluene, in the presence of hydrogen gas to form a simpler aromatic hydrocarbon devoid of functional groups. An example is the conversion of 1,2,4-trimethylbenzene to xylene. This chemical process usually occurs at high temperature, at high pressure, or in the presence of a catalyst. These are predominantly transition metals, such as chromium or molybdenum. [Source: Wikipedia, accessed December 2022]
Emergency & Consequences
- Number of injured persons
- 0
- Number of fatalities
- 0
Lesson Learnt
- Lesson Learnt
It is critical to have in place a Quality Control system for the consumables or parts replaced during maintenance or repair. Especially because these activities are often performed by contractors, there is always the possibility of a mismatch. The Quality Control could take the form of a check list to be executed by a plant supervisor, and/or consist in a full fledged quality control system agreed along the supply chain (for example based on ISO 9000 standard series).
It is critical to have in place a Quality Control system for the consumables or parts replaced during maintenance or repair. Especially because these activities are often performed by contractors, there is always the possibility of a mismatch. The Quality Control could take the form of a check list to be executed by a plant supervisor, and/or consist in a full-fledged quality control system agreed along the supply chain (for example based on ISO 9000 standard series).
Event Nature
- Release type
- no release
- Released amount
- 0
- Presumed ignition source
- No release
References
- Reference & weblink
Event 9873 of the UK database ICHEME in PDF<br />
<br />
https://www.icheme.org/knowledge/safety-centre/resources/accident-data/… />
(accessed October 2020)<br />
JRC assessment
- Sources categories
- ICHEME